In order to evaluate revisions that have been withdrawn and thus ensure traceability, a functionality has been created with which the revisions that have been withdrawn and their working copies can be displayed in DC Document Controlling.
Search Results Software Products:
Paths in ACAD / PLM Reference Manager and Topic ADT in Navisworks
With the development of a PLM reference manager, document paths referenced in DMS AutoCAD can be changed and adapted to the DMS system.
Return transmittal from an input transmittal
A new function "Return Transmittal" has been developed in the ToDo, which automatically generates a new transmittal when the ToDo is completed.
The label of the processes per process type and language
The table for the description of tasks (Ticket_Type) has been extended by 3 new classifications (Label), also in bilingual view German / English.
DMS - controlled application start
A new function to start a DWG file without an application in a topic was developed.
Navisworks revision in DMS
The development of a new Planet Plugin for Navisworks provides an extension of the functionalities in the DMS revision process with regard to the use of PLM NAV. This makes it possible to display different trades with different revision statuses.
Create Transmittal from PLM e-mail with DMS documents
Most documents for verification are sent by email or post. These can now be directly integrated into the Transmittal process.
DMS Quick Search
The quick search we developed was based on a workshop and frequent requests from our customers. The search for documents in DMS was thus considerably simplified and accelerated.
DMS Export Extension
The existing quick selection for exporting files from DMS has been extended by a function with which additional documents can be transferred beyond the revision.
Type assignment of the ToDo procedure with storage of the reports for revision or version
As part of the ToDo procedure for the administration of L & L reports, the possibility was created to file reports in DMS for existing versions or revisions without having to go through a revision procedure in DMS.