+49 231 935015 0 info@plm-planet.com

Search results keywords:

 

PLM DMS - archiving of correction processes in the revision-release procedure

PLM DMS - archiving of correction processes in the revision-release procedure

Meldung vom: October 2019

The revision procedure in PLM DMS can now archive the completed correction processes.
All audit steps passed in the revision procedure can generate correction processes with the corresponding information such as comments and / or redlining.
After the document has been released, all files created in this context are combined in a PDF. This PDF also contains bookmarks for the to-dos associated with the correction process.

Each todo is accompanied by a text file containing further information on the history such as date, signature, comments etc. This text file is used as header for the individual redlining files in the overall PDF.

PLM DMS - Extension of the DMS revision release procedure

PLM DMS - Extension of the DMS revision release procedure

Meldung vom: October 2019

The PLM DMS revision release procedure has been enhanced with additional functionalities such as project processing phases and the document purpose.

This ensures a controlled workflow in the processing and testing of documents along the project processing phases. The testing and verification run is stored in a redlining ....RL.PDF document in DMS.

A PLM ToDo regulates the process of document testing in a template.

  • A - Accepted
  • B - Accepted with remark
  • C - Refusals
  • Sign
  • lRedlining
With these new possibilities, testing processes can be documented in terms of what and who triggered them.
Space development with allocation of load levels on a surface grid

Space development with allocation of load levels on a surface grid

Meldung vom: February 2019

The viewer integrated in NPP PLANET was extended in such a way that now CAD independent spatial developments can be displayed and queried and edited with regard to metadata.

In addition to the already existing display of an entire room development, the areas of the room developments can now also be addressed individually and assigned a configurable area grid. Each of these grid areas can be provided with the measured radiological exposure.

en_GBEnglish (UK)
Powered by TranslatePress