+49 231 935015 0 info@plm-planet.com
Select Page

Search results keywords:

 

PLM DMS - DC Phasen Controlling combines document phase and document purpose

PLM DMS - DC Phasen Controlling combines document phase and document purpose

Meldung vom: November 2019

Project processing (revision procedures) can be divided into a fixed sequence in DocWorkState, such as basic engineering, detail engineering, etc. Subordinate document purposes, such as "for review", "for approval" or "for attestation", etc., describe what is to happen to the document, also in a fixed order.

Within the framework of DC Phase Controlling, the DocWorkState now becomes the "DC Phase" and the document purpose becomes the "Action" package. For each "Action" package there is a ToDo template that controls the revision process. This is assigned to the action package.

The combination of a DC phase with the different "action" packages results in a DC structure tree.
The DC phases link the individual steps in the project flow with the PLM project management and ensure that the stored documentation has passed through the individual processing steps of the revision procedure in a controlled manner during the project flow.

PLM DMS - Extension of the DMS revision release procedure

PLM DMS - Extension of the DMS revision release procedure

Meldung vom: October 2019

The PLM DMS revision release procedure has been enhanced with additional functionalities such as project processing phases and the document purpose.

This ensures a controlled workflow in the processing and testing of documents along the project processing phases. The testing and verification run is stored in a redlining ....RL.PDF document in DMS.

A PLM ToDo regulates the process of document testing in a template.

  • A - Accepted
  • B - Accepted with remark
  • C - Refusals
  • Sign
  • lRedlining
With these new possibilities, testing processes can be documented in terms of what and who triggered them.
en_GBEnglish (UK)
Powered by TranslatePress