PLM DMS can now insert analogue stamps into PDF documents right-controlled
Meldung vom: November 2019
The project phases (e.g. basic engineering, construction, detail engineering) available in the Document Control Module for controlling the project execution, through which the revision procedure is controlled, offer extensive configuration options for a project.
To reduce configuration work when creating new projects, this module has been extended with a selectable copy function.
Now DC phase configurations can also be transferred to other projects and systems in a dialogue-driven manner.
Related software products
Related product area
Keywords: Approval process | authorized persons | Document Control | Document Control phases | Revision | Revision procedure | stamp | Document management | exam | pin code | Attestation | Attestations