+49 231 935015 0 info@plm-planet.com
Select Page

Search results keywords:

 

Retain revision history when withdrawing a revision

Retain revision history when withdrawing a revision

Message from: September 2021

In order to evaluate revisions that have been withdrawn and thus ensure traceability, a functionality has been created with which the revisions that have been withdrawn and their working copies can be displayed in DC Document Controlling.

 

 

 

Our customers had the problem that documents created by DMS, which were manually entered into the model via the AutoCAD reference manager, could no longer be found by the DMS functions. To solve this problem, a function was implemented that searches for the document in the system path, reloads it into the DMS and can thus rewrite the ACAD reference.

Furthermore, a new topic ADT (AutoCAD Architectural Desktop) was introduced for the use of Navisworks for controlled application editing in DMS.

PLM DMS can now insert analogue stamps into PDF documents right-controlled

PLM DMS can now insert analogue stamps into PDF documents right-controlled

Meldung vom: November 2019

The project phases (e.g. basic engineering, construction, detail engineering) available in the Document Control Module for controlling the project execution, through which the revision procedure is controlled, offer extensive configuration options for a project.

To reduce configuration work when creating new projects, this module has been extended with a selectable copy function.
Now DC phase configurations can also be transferred to other projects and systems in a dialogue-driven manner.

en_GBEnglish (UK)
Powered by TranslatePress