The project phases (e.g. basic engineering, construction, detail engineering) available in the Document Control Module for controlling the project execution, through which the revision procedure is controlled, offer extensive configuration options for a project.
Search Results Software Products:
PLM DMS/DCI - DCC Favourites
A new feature was implemented in both PLM DMS and DCI (Document Control Interface). The DCC (Document Control Code) describes and classifies the type of documentation (e.g. FA010 for overview circuit diagram, FB030 for P&I flow diagram, FF040 for flow chart etc.).
PLM DMS - DC Phasen Controlling combines document phase and document purpose
Project processing (revision procedures) can be divided into a fixed sequence in DocWorkState, such as basic engineering, detail engineering, etc. Subordinate document purposes, such as "for review", "for approval" or "for attestation", etc., describe what is to happen to the document, also in a fixed order.
PLM DMS - archiving of correction processes in the revision-release procedure
The revision procedure in PLM DMS can now archive the completed correction processes.
All audit steps passed in the revision procedure can generate correction processes with the corresponding information such as comments and / or redlining.
PLM DMS - Extension of the DMS revision release procedure
The PLM DMS revision release procedure has been enhanced with additional functionalities such as project processing phases and the document purpose.
PLM Office / DMS - alignment of the structure trees in PLM Office and PLM-DMS
Selection records in DMS are controlled via a structure tree, which is divided into a "project structure" and an individual "user structure".