+49 231 935015 0 info@plm-planet.com

Search results keywords:

 

PLM Office Overview Window Period Setting

PLM Office Overview Window Period Setting

 
Message from: September 2021

The period setting in the PLM Office overview window can now be configured individually, both by the individual user and via the DB Admin Tool.

 

 

 

The menu can be used to select the start and end date of the desired period in the overview window; these settings are saved and are available again the next time PLM Office is called up.

Related software products
Related product area
The label of the processes per process type and language

The label of the processes per process type and language

Message from: June 2021

The table for the description of tasks (Ticket_Type) has been extended by 3 new classifications (Label), also in bilingual view German / English.

 

 

These 6 new table entries are additional information on "Content", "Activity" and "Reason" in German / English. The labels of the activities are displayed differently depending on the activity type and language. An activity type can be e.g. a "Claim", "Request", "File number", "DMS file number".

Related software products
Related product area
DMS - controlled application start

DMS - controlled application start

Message from: June 2021

A new function to start a DWG file without an application in a topic was developed.

 

 

In DMS, a topic is defined for editing a file. This topic defines the controlled editing of a document with a specific application. However, there is a requirement to start files in DMS for editing without an application in a topic, e.g. for inserting labels and instructions in an AutoCAD model, without having to completely load the applications with their control mechanisms. This simplifies and speeds up editing. With the new function "Start file", a flag in the table now determines whether the start should be carried out without or with the PLM Control application.

en_GBEnglish (UK)
Powered by TranslatePress