EI&C electrical, measurement and control data such as actuators and sensors are taken from the latest P&ID database control technology
taken over.
Data consistency to PDE, PID and LET (E-/MSR technology)
Organisation of step chains and sequence programmes
Navigation between P&ID, 3D and FBD (function chart)
Derivation of signal lists - Interlocks - Alarm specifications - Tables of contents
Comprehensive plausibility check
FBD function plan
- PPreparation of function plans according to EN and VGB R 170 C
- POrganisation of step chains
- PData consistency with P&ID, 3D and PDE
- PSignal lists, interlocks, alarm specifications, tables of contents
- PThe function chart can be output as a PDF document
Loop and HookUp
Actuators and sensors are assigned to the stored Typical and HookUp.
Because behind the HookUp of the measuring points there is a set-up plan, quantity structures and prices
a calculation is possible.
Signals and actors
Signals and actuators are assigned to the Typicals and HookUps in a qualified manner.
Switchgears
The connection of the power and control connection from the actuator to the module in
Control cabinet is specified. Electrical circuit diagrams are assigned to the modules as typical.