The period setting in the PLM Office overview window can now be configured individually, both by the individual user and via the DB Admin Tool.
Search Results Software Products:
DMS extension Multiple assignment to a ToDo
As part of an extension of the DMS functionalities, the possibility of assigning several documents to a ToDo was created.
PLM Office Post from DMS
A direct connection from DMS to PLM Office Post has been created, so it is possible to exchange documents between DMS and Office in a controlled manner, both inbound and outbound.
Control of temporary access rights via a ToDo
In DMS, user rights (e.g. write rights) in the task force and role are defined. Sometimes, however, it is necessary to assign certain user rights only for a very limited period of time.
Optimised display of PLM Office deadlines
In PLM Office, deadlines for completion can be assigned to the various objects such as ToDos, tasks, emails, appointments, transmittal, FAX, letters, protocols etc.
DMS and ToDo lists receive the IDC Interface Document Control procedure
The IDC is a procedure for checking PDF files checked into PLM DMS during an external audit. In line with the control of the IDC procedure, the PLM Office ToDo administration has now been extended accordingly with functionalities such as redlining and comments on the check documents.
PLM Office - Extended functionality of the file number
In PLM Office the file number management has been extended. Thus the file numbers were upgraded to a "process", to which "process types" can be assigned in addition.
PLM Office - Modifications - Structure tree from PLM DMS selection sets
The new function enables you to create individually selectable project and user nodes for each project in the PLM Office structure tree. Any number of documents from DMS can then be linked to these nodes as an additional sorting function.
PLM DMS - DCC - Template monitoring by the source document
The DCC Document Control Classification (classification of document types, e.g. regulations, guidelines) provides document templates (e.g. Word) for projects. The DCC configurations are usually only defined once for a company.
PLM PDE - Status report of project-conform standard and ICS component selection
Bautsu (component selection) has the task of reacting to specifications and settings of the component admissibility in the project and to offer only approved components as well as standards in the selection.