+49 231 935015 0 info@plm-planet.com

Bring Change Request CR into DMS by process file number

In order to record the process-specific processing of technical documentation in PLM planets as part of "change management", a PLM process was introduced. This PLM process is now listed in a tree in DMS and can be used as a filter.

Transfer Document Control configurations to other projects

The project phases (e.g. basic engineering, construction, detail engineering) available in the Document Control Module for controlling the project execution, through which the revision procedure is controlled, offer extensive configuration options for a project.

Control of temporary access rights via a ToDo

In DMS, user rights (e.g. write rights) in the task force and role are defined. Sometimes, however, it is necessary to assign certain user rights only for a very limited period of time.

Optimised display of PLM Office deadlines

In PLM Office, deadlines for completion can be assigned to the various objects such as ToDos, tasks, emails, appointments, transmittal, FAX, letters, protocols etc.

en_GBEnglish (UK)
Powered by TranslatePress