DC phases:
In order not to lose the overview of the progress of the individual documents as a project manager, all DMS documents of a project are managed in a controlled manner over a project sequence. The project execution (revision procedure) is controlled via the project phases.
The tree for the Document controlling phases is generated from the DocWorkState and the document purpose, the numbering results from this and determines the sequence.

The following elements are available

DC phases

  • PP = phase (stands for a project phase)
  • PA = Action (stands for processing / checking step)

DocWorkState

  • PBasic engineering
  • PConstruction
  • PDetail engineering

Document purpose

  • PInternal audit
  • PPreliminary examination
  • PVP attestation

In the examples you can see how DC phase controlling creates this connection.

Example of a phase:

  • PComposition: DC phases + DocWorkState
  • PResult: P DC phases + 1. Basic engineering = P-1. Basic engineering

Example of an action:

  • PComposition: DC phases + DocWorkState + document purpose
  • PResult: A DC phases + 1st basic engineering + 1st internal test = A-1.1 internal test